HYDROELECTRIC POWER

Turn Underutilized Hydroelectric Energy Into Computing Power

StrataCore Energy deploys modular computing infrastructure alongside available hydroelectric generation, creating productive value from underutilized generation capacity.

Ideal Site Characteristics

• Power Availability: Sufficient continuous or regularly available electrical capacity for a commercially viable computing deployment

• Power Cost: Economically attractive power suitable for high-load computing operations

• Capacity: Available generation that is currently underutilized, curtailed, stranded, or otherwise difficult to monetize

• Fiber Access: Existing fiber preferably within 2 miles, with sites up to 5 miles considered

• Site Access: Adequate space, road access, security, and locations for power generation and computing infrastructure

• Producer Cooperation: Ability to coordinate site development and applicable regulatory requirements

Have available hydroelectric capacity?