StrataCore Energy deploys modular computing infrastructure alongside available solar generation, creating productive value from underutilized or curtailed renewable energy capacity.
• Power Availability: Sufficient solar generation capacity for a commercially viable computing deployment
• Power Cost: Economically attractive power suitable for high-load computing operations
• Capacity: Available generation that is underutilized, curtailed, stranded, or otherwise difficult to monetize
• Fiber Access: Existing fiber preferably within 2 miles, with sites up to 5 miles considered
• Site Access: Adequate space, road access, security, and locations for power generation and computing infrastructure
• Site Owner Cooperation: Ability to coordinate site development, electrical interconnection, and applicable permitting requirements